LONG TERM MONITORING PROGRAM UPDATES Summary Update - March 1, 2007
View PowerPoint Presentation (PDF)
Summary Update - September 21, 2006
View PowerPoint Presentation (PDF)
Site 16 – Former Creosote Dip Tank and Fire Fighting Training Area
- 1,4-Dioxane Sampling Event
- Presentation: Summary of Supplementary Phase II RI Data Package
- Phase III RI Work Plan
- Status of HRC Pilot Test
View PowerPoint Presentation (PDF)
DF Phase III QAPP for IRP Site 16 (March 2007) View PDF
Stage 1 of the Phase III QAPP for IRP Site 16 (March 2007) View PDF
RTCs and Attachments (March 23, 2007) View PDF
Site 07 Calf Pasture Point (includes Former Munitions Bunkers Area)
- Groundwater, piezometer, and sediment monitoring every 9 months
- Bi-monthly piezometer and surface water sampling
- Navy considering additional investigations to address CVOCs in piezometer samples
Site 09 Allen Harbor Landfill
- Quarterly groundwater, piezometer, sediment, and landfill gas sampling
- Statistical analysis and LTMP optimization performed by Navy
- Proposed modifications to LTMP will be presented to BCT
EBS 21 Former Aboveground Storage Tank DC-133
- Quarterly groundwater sampling
- Statistical analysis and LTMP optimization performed by Navy
- Proposed modifications to LTMP will be presented to BCT
Site 03 Interim Groundwater Sampling Program
PR-58 NIKE SITE – U.S. Army Corps of Engineers
- U.S. Army Corps of Engineers to inquire about gaining access to properties north of Perimeter Road for installation of sentinel wells (as required by RIDEM to complete the site characterization and report).
- Anticipate coordinating property access during August/September 2006
View PowerPoint Presentation (PDF)
|